Industrial engineering
Consultancy
Date: 2005
Client: Airbus D&S
AERTEC provided technical support for the tactical planning of supply to the factory floor of the A400M military transport aircraft final assembly line.
Some of the objectives of this project were:
¬ Support work for the planning and risk department, for time and costs.
¬ As a main objective, design a standard template for internal reporting.
¬ Creation of a methodology for the detection of deviations in terms of benchmarks and risk analysis, planning and defining the method of supply and monthly feedback, carrying out of the static and dynamic balancing of the processes.
¬ Design of a production control process.