Industrial engineering
Consultancy
Date: 2007
Client: Airbus D&S
¬ Update of the technical consultancy study carried out in 2004 in accordance with the programme evolution of the A400M.
¬ During 2007 the monitoring of the implementation of the layouts defined in the previous years was carried out by the factory floor engineers, offering support for any possible changes.
¬ Studies have been carried out on the improvement of organisation works in each assembly station based on the information obtained during the assembly of the first few aircraft.