Systems engineering
On-board system testing > Aviation system engineering
Date: 2003 – present
Client: EADS CASA
Industrialisation of the functional voltage tests:
¬ Check the correct installation of the wiring of the equipment used to feed the bars
¬ Carry out the functional tests for the power supply equipment
¬ Checking the wiring of the different bars and the distribution of the current across them
¬ Carry out the different functional tests