Analysis of logistics requirements for SK3000 plant at Aeropolis Business Park Seville (Spain)

Industrial engineering

Consultancy

Date: 2009

Client: LTK

The aim of this project was the full analysis of the logistics of the plant. The project included:

¬ Analysis of all processes for reception, verification, inventory, and opening of IDS, shipping and returns to the plant.

¬ Transactions that must be carried out in SAP R/3 for accounting purposes.

¬ Study of demand, rotation, geometry, restrictions, handling and other characteristics of the materials supplied to the plant.

¬ Establishment of requirements for storage space in the new external logistics centre and layout definition.

¬ Development of a specific operational plan which defines all conditions of the service to be provided by the logistic operator.

¬ Preliminarily analysis of possible future improvements relating to the logistics tools.

Download file

Share