Delivery of the first Airbus A400M

 

The first Airbus A400M has been delivered to the French Air Force and has already entered service. More than a hundred experts from AERTEC are developing their activities around this strategic project of the European aeronautical consortium.

The A400M, the new-generation military transport aircraft from Airbus Military, received its Initial Operating Clearance (IOC) last July as a preliminary step towards its delivery to the French Armed Forces, which took place on September 1st in Seville, marking an important milestone in military air transport in Europe.

This delivery represents the culmination of 10 years of development by Airbus Military and more than 5,000 hours of flight testing, which has involved engineers, technicians and specialists from several European Union countries in a joint effort.

The delivery, which has just been taken over by the French General Directorate of Armament (DGA), allows the MSN7 (as the device is called) to be transferred to the military air base of Orleans-Bricy and incorporated into the fleet of aircraft of the French Air Force stationed at that base.

Undoubtedly, this is a historic event for the European aerospace sector, which becomes the new global leader in the field of military transport with an entirely new and innovative aircraft in many respects.

This first aircraft will be used, in a first phase, for the continued training of the crew, before becoming part of the operational transport fleet of the French Air Force.

AERTEC joined the A400M program in 2004, and since then it has been developing engineering services in the industrial and manufacturing phases of the project.

These include:

Industrial Engineering

  • Industrial and Logistic Organization of the FAL A400M
  • Industrial Organization and Specifications for the LTK Logistics Center for the A400M (among others). Building Design (Infrastructure)
  • Production Planning and Control of all stations
  • Planning internal programs such as the FSF
  • Various activities at the Flight Test Centre

Manufacturing Engineering

  • Systems Engineering (Stations 35, 30, 20 and 15)
  • Specification and monitoring of Test Means
  • Engineering of Equipment
  • Process industrialization (Stations 35, 30 and 20) and support in the workshop
  • Electrical Manufacturing Engineering in the Electrical Workshop
  • Material Review Engineering
  • Industrialization and technical support for the REC (Rework Electrical Centre)
  • Standardization and process improvements (all stations)

Video of the award ceremony: http://videos.airbus.com/video/b7e307e9129s.html

 

Opinion

David Doral – Director of Product & Manufacturing Engineering.

For AERTEC, the A400M is an important support for our aerospace business, which has not only allowed us to develop almost all of our initial capabilities, but has also helped us develop new ones. We have been involved in the program since its inception and hope to continue working on it throughout its lifecycle.

We started about 10 years ago, with some of the engineering activities concurrently underway, particularly in relation to system integration, which allows the design to be aligned with future manufacturing. We were also working at the time on the design and construction of the Final Assembly Line (FAL), and on the definition and optimization of the assembly line, as well as the logistics and industrial processes.

Once production had begun, we continued with our work on system engineering, began providing support for testing and the installation and assembly processes of the systems, and helped AIRBUS Military with production control and the planning of manufacturing activities at almost all the stations.

Now, with the gradual increase in production and the acquisition of GLENSER Aerospace, we continue working hard in all the aforementioned areas, and we have incorporated the development of new activities to adapt to the growth in the pace that AIRBUS is imposing on itself and its entire supply chain, the logical result of the production advance. Our engineering teams, our testing systems, our industrial facilities, the capacity of our tools, the resources of our industrialization processes, structural and system installation, as well as our electrical support professionals and other auxiliary manufacturing personnel are being put to intense testing over the past year, in honor of our reputation as a solutions company that is prepared for the challenge and feeds on it.

Overall, it has been and continues to be an interesting journey for AERTEC, which began dedicating some engineers to this program a decade ago, and today has nearly 100 people who work on the A400M. Many of the professionals who joined us as young engineers and recent graduates have grown with the company to become professionals of recognized prestige. Thanks to AERTEC’s continued commitment to new talent and its unwavering support for projects like the A400M, we have gone from being a small local company to a multinational aeronautical engineering company with more than 350 employees in just over 15 years.

header-095

 

 

Share

More topical issues

Portaviones
17/11/2026

The first aircraft carrier

Micromissile FOX
13/11/2026

AERTEC is making progress with the validation of the FOX micro-missile, designed for drones

SAETA II program
05/11/2026

AERTEC will develop the Remote Interface Unit (RIU) for the SAETA II program

Zephyr HAPS
27/10/2026

AERTEC and AALTO are joining forces to drive the future of stratospheric aviation

Airbus A300
20/10/2026

The Airbus A300 and the flight that changed the course of European aviation

Access to restricted airport areas
13/10/2026

Airport security: access to restricted areas

Contact