Control tower planning: a starting point

 

By launching the Planning of a new control tower Two frequently asked questions often arise in the field of air traffic: where building it and what they are Main requirements of such a crucial building of the airport.

Most states have direct control over these issues, as air traffic control providers are usually public companies. But even in these cases, some countries do not provide or publish any list of requirements, whether specific or generic.

The important thing will be to understand the expectations and demands of both the client and the end user, so that they can be translated into a series of technical requirements that will determine the planning and design process.

In these cases, Previous experience is vital when helping the customer deciding what type of infrastructure is to be planned. In the absence of clear guidelines, some authorities do publish part of their documents with the planning and design criteria. If the appropriate knowledge is available, these documents can prove to be very valuable resources when dealing with the planning exercise of a control tower. But, where can such documents be found?

  • Order 6480.4A of the FAA (Federal Aviation Administration, USA) It is a good place to start, if not the best. It provides basic general information about the criteria that should determine the selection process for the tower’s location. In addition, The topic of visibility is deepened which must be present, and includes a web-based software tool that allows checking whether the minimum visibility criteria are met, both in terms of the angle of incidence and the probability of detection and recognition of objects: https://www.faa.gov/regulations_policies/orders_notices/index.cfm/go/document.information/documentID/15735
  • The DGAC, in France, has published a document in which it also The issue of the location is explored in depth from the control tower, as well as in its functional requirements and in the architectural design criteria. However, this document is less strict regarding the minimum visibility requirements than the FAA document: http://www.stac.aviation-civile.gouv.fr/publications/gnt-amena.php
  • Aena, in Spain, They usually publish a document with requirements. referring to each control tower which is going to be designed. The structure of this document is very similar to that of the document from the French DGAC, although it is much more demanding in terms of visibility criteria. It also sets requirements regarding elements such as the supply of energy, the configuration of the cabin and the fire detection and extinguishing systems.

In addition to the documents mentioned, depending on the situation, some of the following documents may also be useful:

In the end, unless specific regulations are in effect in the place for which the control tower is planned or designed, what will be important is Understanding expectations and demands Both from the client and the end user, so that they can be translated into a series of technical requirements that will determine the planning and design process.

cabecera-298web

 

Share

More topical issues

Ecovadis certification at AERTEC
23/11/2026

AERTEC improves its Ecovadis score

Portaviones
17/11/2026

The first aircraft carrier

Micromissile FOX
13/11/2026

AERTEC is making progress with the validation of the FOX micro-missile, designed for drones

SAETA II program
05/11/2026

AERTEC will develop the Remote Interface Unit (RIU) for the SAETA II program

Zephyr HAPS
27/10/2026

AERTEC and AALTO are joining forces to drive the future of stratospheric aviation

Airbus A300
20/10/2026

The Airbus A300 and the flight that changed the course of European aviation

Contact