Tribune by Patrick Lambrechts, Brussels South Charleroi Airport

 

The Brussels South Charleroi Airport It is located 50 km from Brussels.

Our airport has experienced a exponential growth In recent years, with an increase in the number of passengers from 200,000 in 2000 to 7,200,000 in 2016.

The airlines Ryanair, TUI, Wizzair and Pegasus are present in Charleroi, with a variety of offers. exceeds 100 destinations.

The opening of these expansions means the possibility of continuing to grow and achieving the goal of 10,000,000 passengers by 2024.

The current terminal was inaugurated in 2008 and was originally designed to handle 3,000,000 passengers. Today it is completely saturated and unable to accommodate new airlines or create the appropriate operating conditions for the development of existing ones.

Currently, about twenty aircraft have their base at the airport, which generates significant traffic peaks: more than 3,000 passengers take off between 6:30 a.m. and 7:30 a.m., and the same number of people land at night, between 10 p.m. and 11 p.m.

More specifically, the phases of airport process Those that have reached the saturation point are the following:

  • The billing counters: 25 counters
  • The security zone: 8 posts
  • The baggage collection area: 3 conveyor belts
  • The boarding areas

Given the context described, we have decided to build a expansion on the one hand, increase comfort for passengers and, on the other hand, to drive our future growth.

Charleroi-expansion-002As soon as it began, the following priorities were defined:

  1. Eliminating the current congestion points
  2. Driving our growth
  3. Building a simple, fast, and flexible expansion
  4. Respect the determined budget

Accordingly with these priorities, we have chosen to build an expansion consisting of two buildings.

The first building will only contain the «No-Schengen» boarding areas, connected to the existing terminal. The «complex» part (border control, separation of passenger flows and customs) of this process is managed in the existing terminal.

This expansion comprises 3 separate zones covering a total area of +/- 1,500 m2.

The second building, dedicated to the «Schengen» passengers, is a completely independent terminal with:

  • A combined boarding and landing hall
  • 8 billing counters
  • 3 double positions for X-ray controls
  • 3 boarding rooms
  • 1 luggage collection area with 2 conveyor belts
  • 1 semi-automatic luggage sorting zone
  • A shopping area

Charleroi-expansion-001The total area of the area is +/- 4,500 m2.

From an architectural point of view, the focus has been placed on the simplicity and brightness. The building is all on one level; the structure is made of steel and the finishes are basic: smooth cement for the floors, non-suspended ceilings and visible technical systems.

Thanks to these elements, the construction was quick: the works began on March 14 and were completed on December 22, that is, a little over 9 months for a plant with a total area of +/- 6,000 m².2 and a total budget of 11,500,000 Euros.

The opening of these expansions means, for Charleroi Airport, the possibility of continuing to grow Thanks to capacity increase so that more planes can establish their base there and achieve the goal of 10,000,000 passengers by 2024.

 

 

Share

More topical issues

Ecovadis certification at AERTEC
23/11/2026

AERTEC improves its Ecovadis score

Portaviones
17/11/2026

The first aircraft carrier

Micromissile FOX
13/11/2026

AERTEC is making progress with the validation of the FOX micro-missile, designed for drones

SAETA II program
05/11/2026

AERTEC will develop the Remote Interface Unit (RIU) for the SAETA II program

Zephyr HAPS
27/10/2026

AERTEC and AALTO are joining forces to drive the future of stratospheric aviation

Airbus A300
20/10/2026

The Airbus A300 and the flight that changed the course of European aviation

Contact