Industrial engineering
Infrastructures
Works management and supervision, materials monitoring and health & safety monitoring
Date: 2001-2002
Client: Turboprop industry – Spanish Air Force
The work conducted by AERTEC Solutions in this
project involved works management and overseeing
the construction of the EJ 200 engine test bench. EJ
200 technology allows for smaller simpler engines while reducing fuel consumption and increasing the thrust- to-weight ratio, thereby enhancing a combat aircraft’s performance and effectiveness. The building is equipped with all kinds of services, sanitation, supplies and electricity. It is within the Moron de la Frontera Air Base (Seville) and located adjacent to a consolidated development.
Building
¬ Workshop area on ground floor ¬ Test cell
¬ Compressed air room
¬ Sound proofing
Technical data
¬ Plot surface area measuring: 4,796m2
¬ Gross floor area measuring: 778.83m2
¬ Net floor area measuring: 748.83m2