{"id":7127,"date":"2025-05-05T11:33:22","date_gmt":"2025-05-05T11:33:22","guid":{"rendered":"https:\/\/dev.aertecsolutions.com\/?post_type=proyecto&#038;p=7127"},"modified":"2025-08-22T06:17:44","modified_gmt":"2025-08-22T06:17:44","slug":"aeronautical-safety-study-of-runway-pavement-at-daniel-oduber-quiros-airport-costa-rica","status":"publish","type":"proyecto","link":"https:\/\/aertecsolutions.com\/en\/proyecto\/estudio-aeronautico-de-seguridad-del-pavimento-de-pista-del-aeropuerto-daniel-oduber-quiros-costa-rica\/","title":{"rendered":"Aeronautical safety study of the runway pavement at Guanacaste Airport (Costa Rica)"},"content":{"rendered":"<h5 class=\"wp-block-heading\">Client: Vinci Airports and Coriport <\/h5>\n\n\n\n<h5 class=\"wp-block-heading\">Aeronautical safety study (2019)<\/h5>\n\n\n\n<div style=\"height:41px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph translation-block\"><strong>Costa Rica's Daniel Oduber Quri\u00f3s Airport<\/strong> (second largest in the country with 1.1 million pax\/year), in the province of Guanacaste, requested an aeronautical study to assess the <strong>safety of air operations<\/strong> based on the condition of the runway pavement.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">AERTEC performed the safety risk management analysis with regard to the condition of the pavement on the runway, taxiways and apron:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Application of ICAO regulations doc. 9859 \/ Operational safety management systems <\/li>\n\n\n\n<li>Risk management mitigation measures <\/li>\n\n\n\n<li>Technical reports on the runway pavement<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">AERTEC drew on its previous experience in operational safety and runway paving to provide a rigorous and critical assessment, allowing the client to understand the risks related to air operations and the condition of the runway.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>","protected":false},"featured_media":11728,"template":"","etiquetas-proyectos":[425,429],"class_list":["post-7127","proyecto","type-proyecto","status-publish","has-post-thumbnail","hentry","etiquetas-proyectos-aeropuertos","etiquetas-proyectos-aeropuertos-operaciones"],"_links":{"self":[{"href":"https:\/\/aertecsolutions.com\/en\/wp-json\/wp\/v2\/proyecto\/7127","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aertecsolutions.com\/en\/wp-json\/wp\/v2\/proyecto"}],"about":[{"href":"https:\/\/aertecsolutions.com\/en\/wp-json\/wp\/v2\/types\/proyecto"}],"version-history":[{"count":3,"href":"https:\/\/aertecsolutions.com\/en\/wp-json\/wp\/v2\/proyecto\/7127\/revisions"}],"predecessor-version":[{"id":11730,"href":"https:\/\/aertecsolutions.com\/en\/wp-json\/wp\/v2\/proyecto\/7127\/revisions\/11730"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/aertecsolutions.com\/en\/wp-json\/wp\/v2\/media\/11728"}],"wp:attachment":[{"href":"https:\/\/aertecsolutions.com\/en\/wp-json\/wp\/v2\/media?parent=7127"}],"wp:term":[{"taxonomy":"etiquetas-proyectos","embeddable":true,"href":"https:\/\/aertecsolutions.com\/en\/wp-json\/wp\/v2\/etiquetas-proyectos?post=7127"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}