{"id":7118,"date":"2025-05-05T11:25:50","date_gmt":"2025-05-05T11:25:50","guid":{"rendered":"https:\/\/dev.aertecsolutions.com\/?post_type=proyecto&#038;p=7118"},"modified":"2025-08-22T06:29:10","modified_gmt":"2025-08-22T06:29:10","slug":"operational-safety-oversight-spain","status":"publish","type":"proyecto","link":"https:\/\/aertecsolutions.com\/en\/proyecto\/control-de-la-seguridad-operacional-espana\/","title":{"rendered":"Control of operational safety (Spain)"},"content":{"rendered":"<h5 class=\"wp-block-heading\">Client: AENA<\/h5>\n\n\n\n<h5 class=\"wp-block-heading\"><em>Control, monitoring and technical support (2009 \u2013 present)<\/em><\/h5>\n\n\n\n<div style=\"height:39px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Operational safety<\/strong> is the state in which the risk of injury to persons or damage to property is reduced and maintained at or below an acceptable level, by means of a<strong> continuous process of hazard identification and risk management<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Operational safety has become the <strong>main element in the planning, development and analysis of aeronautical operations<\/strong>. In order to guarantee the safety of aircraft, passengers, agents operating around aircraft, and airport infrastructures, all necessary measures must be implemented.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As well as being advisable, these measures are also mandatory under Royal Decree 862\/2009, of 14 May 2009, approving the technical standards for the design and operation of airports for public use and governing the certification of state-controlled airports.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">AENA outlines these measures in its documents (by means of Procedures, Operating Instructions\/EXAs and\/or Technical Instructions), which are required to implement Operational Safety Management Systems (OSMS) at its airports and\/or for drafting projects and executing construction works.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">AERTEC has <strong>extensive experience<\/strong> in developing and implementing the following measures:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Monitoring of technical design and operating standards <\/li>\n\n\n\n<li>Airport certification process and implementation and monitoring of OSMS<\/li>\n\n\n\n<li>Airport manuals<\/li>\n\n\n\n<li>Training in operational safety and OSMS<\/li>\n\n\n\n<li>Oversight of handling agents in matters of operational safety<\/li>\n\n\n\n<li>Supervision and analysis of the OSMS of handling agents<\/li>\n\n\n\n<li>Analysis of operability and phasing of construction works at project and works level<\/li>\n\n\n\n<li>Drafting of Operational Safety Plans (OSPs) and Operational Safety Surveillance Plans (OSSPs)<\/li>\n\n\n\n<li>Aviation Safety Officer (ASO) and Aviation Safety Inspector (ASI) services<\/li>\n\n\n\n<li>Aeronautical safety studies<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The projects we have completed for AENA include:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Palma de Mallorca Airport<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Oversight and monitoring of handling agents in matters of operational safety (2015-present)<\/li>\n\n\n\n<li>Implementation and maintenance of OSMS (2012-2014)<\/li>\n\n\n\n<li>Technical support for the certification process and maintenance of OSMS (2012) <\/li>\n\n\n\n<li>Technical support for the implementation and maintenance of the Operational Safety Management System (2009-2012)<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>","protected":false},"featured_media":7119,"template":"","etiquetas-proyectos":[425,429],"class_list":["post-7118","proyecto","type-proyecto","status-publish","has-post-thumbnail","hentry","etiquetas-proyectos-aeropuertos","etiquetas-proyectos-aeropuertos-operaciones"],"_links":{"self":[{"href":"https:\/\/aertecsolutions.com\/en\/wp-json\/wp\/v2\/proyecto\/7118","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aertecsolutions.com\/en\/wp-json\/wp\/v2\/proyecto"}],"about":[{"href":"https:\/\/aertecsolutions.com\/en\/wp-json\/wp\/v2\/types\/proyecto"}],"version-history":[{"count":3,"href":"https:\/\/aertecsolutions.com\/en\/wp-json\/wp\/v2\/proyecto\/7118\/revisions"}],"predecessor-version":[{"id":11736,"href":"https:\/\/aertecsolutions.com\/en\/wp-json\/wp\/v2\/proyecto\/7118\/revisions\/11736"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/aertecsolutions.com\/en\/wp-json\/wp\/v2\/media\/7119"}],"wp:attachment":[{"href":"https:\/\/aertecsolutions.com\/en\/wp-json\/wp\/v2\/media?parent=7118"}],"wp:term":[{"taxonomy":"etiquetas-proyectos","embeddable":true,"href":"https:\/\/aertecsolutions.com\/en\/wp-json\/wp\/v2\/etiquetas-proyectos?post=7118"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}