{"id":11789,"date":"2025-08-22T10:42:15","date_gmt":"2025-08-22T10:42:15","guid":{"rendered":"https:\/\/aertecsolutions.com\/?post_type=proyecto&#038;p=11789"},"modified":"2025-08-22T10:42:16","modified_gmt":"2025-08-22T10:42:16","slug":"maintenance-hangar-for-12-eurofighters-moron-air-base-spain","status":"publish","type":"proyecto","link":"https:\/\/aertecsolutions.com\/en\/proyecto\/hangar-de-mantenimiento-para-12-eurofighters-base-aerea-de-moron-espana\/","title":{"rendered":"Maintenance hangar for 12 Eurofighters; Moron Air Base (Spain)"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Customer: Airbus Defence and Space<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Industrial engineering \/ Infrastructures \/ Detailed design and site management (2010 - 2014)<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As part of various actions to modernise the Mor\u00f3n de la Frontera air base, the project consists of the design of a building that includes a hangar, offices and a fire station, as well as the remodelling and extension of the warehouse. The hangar should have sufficient capacity to house 12 Eurofighter EF-200 aircraft and the necessary facilities to carry out maintenance operations. Its size allows for the parking of aircraft and their movement within the hangar.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The office facilities are divided in such a way that the programme management and production control department is located on the upper floor and the workshops on the ground floor.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The fire station has a surface area of 1,500 m\u00b2 and houses a vehicle workshop area, living units, administrative facilities for the hospital, communications and alarm systems, among other facilities.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The warehouse has been extended by approximately 2,400 m\u00b2. In order to achieve greater storage capacity, a paved area of 6,000 m\u00b2 has been fitted out on an adjacent plot, in order to optimise the distribution between the different areas and stored items.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Phases of the work<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00ac Detailed design<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00ac Works management<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00ac Health and safety coordination<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Scope of work<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00ac Maintenance hangar for 12 EFA-2000 aircraft directly connected to the aircraft apron<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00ac Fire station. Capacity for 10 fire-fighting vehicles.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00ac New roads to improve intra-base connections<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00ac Extension and refurbishment of the building, including:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Expansion of the logistics warehouse<\/li>\n\n\n\n<li>Expansion and refurbishment of offices<\/li>\n\n\n\n<li>Outdoor supplies apron<\/li>\n\n\n\n<li>Ground floor parking for 240 vehicles<\/li>\n\n\n\n<li>Connecting roads<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Technical data<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00ac Metal structure<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00ac Non-accessible self-supporting roof and skylights<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00ac Lifelines<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00ac Enclosure made of soundproof panels 80mm thick.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00ac Reinforced concrete footing of 20 cm thickness<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00ac 30x9m four-section motorised hangar door<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00ac Sanitation<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00ac Stormwater and wastewater<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00ac Supplies<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00ac Domestic hot water using solar thermal energy<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00ac Distribution station<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00ac Transformer station<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00ac Low-voltage electrical installation<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00ac Earthing network<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00ac Outdoor and indoor lighting<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00ac Air conditioning and ventilation control<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00ac Diesel installation<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00ac Energy management system<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00ac Communications<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00ac Public address system<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00ac Fire protection installations according to NFPA criteria: closed-head water sprinkler system, manual system equipped with 45 mm water hoses (BIE), fire hydrants, self-oscillating water and low expansion foam monitors, portable water and foam carts, early detection system by aspiration, triple infrared technology (IR3) sensor system, interior audible alarm system and exterior visual and audible alarm system.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00ac Areas: Aircraft hangar area 5.496,46m2 \/ Offices and workshops 1.316,46 + 1.260,48 = 2.576,94m2 \/ Parking area for fire vehicles 1.116,75m2 \/ Auxiliary fire brigade building 528,90 + 485,79 = 1.014,69m2 \/ Urbanisation of land 13.075,57m2 \/ New roads 11.542,50m2, Supply warehouse building 4.961,55m2 \/ Offices in warehouse building 1.484,44m2 \/ Exterior platform 5.952,00m2 \/ Connecting roads 6.288,00m2<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00ac General foundations made with piles and pile caps in situ.<\/p>","protected":false},"featured_media":11790,"template":"","etiquetas-proyectos":[431,432],"class_list":["post-11789","proyecto","type-proyecto","status-publish","has-post-thumbnail","hentry","etiquetas-proyectos-industria","etiquetas-proyectos-industria-ingenieria-procesos-y-sistemas"],"_links":{"self":[{"href":"https:\/\/aertecsolutions.com\/en\/wp-json\/wp\/v2\/proyecto\/11789","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aertecsolutions.com\/en\/wp-json\/wp\/v2\/proyecto"}],"about":[{"href":"https:\/\/aertecsolutions.com\/en\/wp-json\/wp\/v2\/types\/proyecto"}],"version-history":[{"count":1,"href":"https:\/\/aertecsolutions.com\/en\/wp-json\/wp\/v2\/proyecto\/11789\/revisions"}],"predecessor-version":[{"id":11791,"href":"https:\/\/aertecsolutions.com\/en\/wp-json\/wp\/v2\/proyecto\/11789\/revisions\/11791"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/aertecsolutions.com\/en\/wp-json\/wp\/v2\/media\/11790"}],"wp:attachment":[{"href":"https:\/\/aertecsolutions.com\/en\/wp-json\/wp\/v2\/media?parent=11789"}],"wp:term":[{"taxonomy":"etiquetas-proyectos","embeddable":true,"href":"https:\/\/aertecsolutions.com\/en\/wp-json\/wp\/v2\/etiquetas-proyectos?post=11789"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}