{"id":3041,"date":"2017-01-23T23:00:00","date_gmt":"2017-01-23T23:00:00","guid":{"rendered":"https:\/\/dev.aertecsolutions.com\/tribuna-por-patrick-lambrechts-aeropuerto-de-charleroi\/"},"modified":"2025-08-20T09:08:51","modified_gmt":"2025-08-20T09:08:51","slug":"tribune-by-patrick-lambrechts-at-charleroi-airport","status":"publish","type":"post","link":"https:\/\/aertecsolutions.com\/en\/blog\/tribuna-por-patrick-lambrechts-aeropuerto-de-charleroi\/","title":{"rendered":"Tribune by Patrick Lambrechts, Brussels South Charleroi Airport"},"content":{"rendered":"<p>&nbsp;<\/p>\n<p>The <strong>Brussels South Charleroi Airport<\/strong> It is located 50 km from Brussels.<\/p>\n<p>Our airport has experienced a <strong>exponential growth<\/strong> In recent years, with an increase in the number of passengers from 200,000 in 2000 to 7,200,000 in 2016.<\/p>\n<p>The airlines Ryanair, TUI, Wizzair and Pegasus are present in Charleroi, with a variety of offers. <strong>exceeds 100 destinations<\/strong>.<\/p>\n<h5>The opening of these expansions means the possibility of continuing to grow and achieving the goal of 10,000,000 passengers by 2024.<\/h5>\n<p>The current terminal was inaugurated in 2008 and was originally designed to handle 3,000,000 passengers. Today it is completely saturated and unable to accommodate new airlines or create the appropriate operating conditions for the development of existing ones.<\/p>\n<p>Currently, about twenty aircraft have their base at the airport, which generates significant traffic peaks: more than 3,000 passengers take off between 6:30 a.m. and 7:30 a.m., and the same number of people land at night, between 10 p.m. and 11 p.m.<\/p>\n<p>More specifically, the phases of <strong>airport process<\/strong> Those that have reached the saturation point are the following:<\/p>\n<ul>\n<li>The billing counters: 25 counters<\/li>\n<li>The security zone: 8 posts<\/li>\n<li>The baggage collection area: 3 conveyor belts<\/li>\n<li>The boarding areas<\/li>\n<\/ul>\n<p>Given the context described, we have decided to build a <strong>expansion<\/strong> on the one hand, <strong>increase comfort for passengers<\/strong> and, on the other hand, <strong>to drive our future growth<\/strong>.<\/p>\n<p><a href=\"https:\/\/aertecsolutions.com\/wp-content\/uploads\/2019\/07\/Charleroi-expansion-002.jpg\"><img fetchpriority=\"high\" decoding=\"async\" class=\"alignright wp-image-21874 size-medium\" src=\"https:\/\/aertecsolutions.com\/wp-content\/uploads\/2019\/07\/Charleroi-expansion-002.jpg\" alt=\"Charleroi-expansion-002\" width=\"300\" height=\"191\"><\/a>As soon as it began, the following priorities were defined:<\/p>\n<ol>\n<li>Eliminating the current congestion points<\/li>\n<li>Driving our growth<\/li>\n<li>Building a simple, fast, and flexible expansion<\/li>\n<li>Respect the determined budget<\/li>\n<\/ol>\n<p>Accordingly with these priorities, we have chosen to build <strong>an expansion consisting of two buildings<\/strong>.<\/p>\n<p>The first building will only contain the \u00abNo-Schengen\u00bb boarding areas, connected to the existing terminal. The \u00abcomplex\u00bb part (border control, separation of passenger flows and customs) of this process is managed in the existing terminal.<\/p>\n<p>This expansion comprises 3 separate zones covering a total area of +\/- 1,500 m<sup>2<\/sup>.<\/p>\n<p>The second building, dedicated to the \u00abSchengen\u00bb passengers, is <strong>a completely independent terminal<\/strong> with:<\/p>\n<ul>\n<li>A combined boarding and landing hall<\/li>\n<li>8 billing counters<\/li>\n<li>3 double positions for X-ray controls<\/li>\n<li>3 boarding rooms<\/li>\n<li>1 luggage collection area with 2 conveyor belts<\/li>\n<li>1 semi-automatic luggage sorting zone<\/li>\n<li>A shopping area<\/li>\n<\/ul>\n<p><a href=\"https:\/\/aertecsolutions.com\/wp-content\/uploads\/2019\/07\/Charleroi-expansion-001.jpg\"><img decoding=\"async\" class=\"alignleft wp-image-21873 size-medium\" src=\"https:\/\/aertecsolutions.com\/wp-content\/uploads\/2019\/07\/Charleroi-expansion-001.jpg\" alt=\"Charleroi-expansion-001\" width=\"300\" height=\"194\"><\/a>The total area of the area is +\/- 4,500 m<sup>2<\/sup>.<\/p>\n<p>From an architectural point of view, the focus has been placed on the <strong>simplicity and brightness<\/strong>. The building is all on one level; the structure is made of steel and the finishes are basic: smooth cement for the floors, non-suspended ceilings and visible technical systems.<\/p>\n<p>Thanks to these elements, the construction was quick: the works began on March 14 and were completed on December 22, that is, a little over 9 months for a plant with a total area of +\/- 6,000 m\u00b2.<sup>2<\/sup> and a total budget of 11,500,000 Euros.<\/p>\n<p>The opening of these expansions means, for Charleroi Airport, <strong>the possibility of continuing to grow<\/strong> Thanks to <strong>capacity increase<\/strong> so that more planes can establish their base there and achieve the goal of <strong>10,000,000 passengers by 2024<\/strong>.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>Brussels South Charleroi Airport is located 50 km from Brussels. Our airport has experienced exponential growth in recent years, with an increase in the number of passengers arriving and departing...<\/p>","protected":false},"author":159,"featured_media":3042,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"content-type":"","footnotes":""},"categories":[1],"tags":[42,10,31,80,40,424,52,28,38,35,50,33,77,39,88],"class_list":["post-3041","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","tag-aerolineas","tag-aeropuertos","tag-arquitectura","tag-calidad","tag-cliente","tag-colaboraciones","tag-competitividad","tag-ingenieria","tag-lineas-aereas","tag-planificacion-y-diseno-aeropuertos","tag-seguridad","tag-it-solutions","tag-sostenibilidad","tag-terminales","tag-turismo"],"_links":{"self":[{"href":"https:\/\/aertecsolutions.com\/en\/wp-json\/wp\/v2\/posts\/3041","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aertecsolutions.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/aertecsolutions.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/aertecsolutions.com\/en\/wp-json\/wp\/v2\/users\/159"}],"replies":[{"embeddable":true,"href":"https:\/\/aertecsolutions.com\/en\/wp-json\/wp\/v2\/comments?post=3041"}],"version-history":[{"count":1,"href":"https:\/\/aertecsolutions.com\/en\/wp-json\/wp\/v2\/posts\/3041\/revisions"}],"predecessor-version":[{"id":8039,"href":"https:\/\/aertecsolutions.com\/en\/wp-json\/wp\/v2\/posts\/3041\/revisions\/8039"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/aertecsolutions.com\/en\/wp-json\/wp\/v2\/media\/3042"}],"wp:attachment":[{"href":"https:\/\/aertecsolutions.com\/en\/wp-json\/wp\/v2\/media?parent=3041"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/aertecsolutions.com\/en\/wp-json\/wp\/v2\/categories?post=3041"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/aertecsolutions.com\/en\/wp-json\/wp\/v2\/tags?post=3041"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}