{"id":3027,"date":"2016-12-23T23:00:00","date_gmt":"2016-12-23T23:00:00","guid":{"rendered":"https:\/\/dev.aertecsolutions.com\/adjudicacion-de-proyecto-en-aeropuerto-de-el-dorado-2\/"},"modified":"2026-03-30T14:27:20","modified_gmt":"2026-03-30T14:27:20","slug":"project-award-at-el-dorado-airport-2","status":"publish","type":"post","link":"https:\/\/aertecsolutions.com\/en\/noticias\/adjudicacion-de-proyecto-en-aeropuerto-de-el-dorado-2\/","title":{"rendered":"El Dorado Airport Project Award 2"},"content":{"rendered":"<p>The Vice-President of the Republic of Colombia, Germ\u00e1n Vargas Lleras, announced the award of the study for the structuring of the new Colombian airport, El Dorado 2, in Bogot\u00e1. The National Infrastructure Agency (ANI) of Colombia <strong>awarded to AERTEC Solutions<\/strong>, alongside the English consultancy Mott MacDonald and the Colombian firm C&amp;M Consultores, the technical, financial, and legal structuring of the new airport for Bogot\u00e1, which will be located just 16 kilometres from the current air terminal. The legal-financial structuring of the project exemplifies the value of aeronautical transaction consulting, which AERTEC provides to operators, investors, and governments in tender and concession processes.<\/p>\n<h5>AERTEC Solutions' growth in Latin America is consolidated through a highly significant project for Colombia.<\/h5>\n<p>The study commissioned to the consortium will be carried out in several phases, during which <strong>a full diagnosis<\/strong> From the technical, financial and legal aspects of the project, traffic and demand forecasts, and studies for the architectural and engineering design of the new buildings, as well as the railway connection between the current El Dorado airport and the future El Dorado 2. The coordination of an international consortium like this requires the same discipline as <a href=\"https:\/\/aertecsolutions.com\/en\/airports\/project-management\/\">Airport project direction and management<\/a>\u00a0which AERTEC applies in construction and renovation projects on 5 continents.<\/p>\n<p>The <strong>Master Plan for the New Airport<\/strong> It is planned to provide a new terminal with a capacity for seven and a half million passengers, which will be added to those served by the current El Dorado airport and the Puente A\u00e9reo terminal. From January to July 2016, 17.6 million passengers passed through this air terminal, according to the Aerocivil report. A project of this magnitude requires a <a href=\"https:\/\/aertecsolutions.com\/en\/airports\/airport-planning-and-design\/\">Airport infrastructure planning<\/a> exhaustive: traffic forecasts, terminal design, rail access and integration with the existing airport.<\/p>\n<p>This is an important project because it involves <strong>Strengthening AERTEC Solutions as an engineering benchmark<\/strong> In the context of Latin American airports, Bogot\u00e1 is one of the great airport megacities of the 21st century and, with this project, aspires to become the hub for air communications between North and South America, as well as between the Americas and Europe.<\/p>\n<p>For Colombia, it is, in the words of its Vice-President, Germ\u00e1n Vargas, a strategic project for the country. El Dorado 2 Airport is the response to the development and growing demand that the aviation business has experienced in Colombia and the world. The mobilisation of air passengers in the country grew by 9.72%% during 2015, increasing from 58 million in 2014 to 63.7 million in 2015, according to the December 2015 Statistical Bulletin, published by Civil Aeronautics.<\/p>\n<p>Carlos Berenguer, General Director of Aviation at AERTEC Solutions, celebrates this new contract because \u201cit consolidates our growth in Latin America through <strong>A project of great importance<\/strong> to Colombia.<\/p>\n<p>This new award in Colombia is in addition to the development of the master plan, which AERTEC Solutions is currently working on for Jos\u00e9 Mar\u00eda C\u00f3rdova International Airport in Rionegro, on the outskirts of Medell\u00edn, also in collaboration with British engineering firm Mott McDonald.<\/p>\n<p>The international engineering and consulting firm specialising in aeronautics continues to consolidate its position in the Latin American airport market, where it is already a benchmark.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignnone size-full wp-image-21012\" src=\"https:\/\/aertecsolutions.com\/wp-content\/uploads\/2019\/07\/ElDorado-103adapt.jpg\" alt=\"eldorado-103adapt\" width=\"1024\" height=\"383\" \/><\/p>","protected":false},"excerpt":{"rendered":"<p>Colombia's National Infrastructure Agency (ANI) awarded AERTEC Solutions, together with Mott MacDonald and C&amp;M Consultores, the technical, financial and legal structuring of the new airport for Bogot\u00e1...<\/p>","protected":false},"author":186,"featured_media":3028,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"content-type":"","footnotes":""},"categories":[55],"tags":[35],"class_list":["post-3027","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias","tag-planificacion-y-diseno-aeropuertos"],"_links":{"self":[{"href":"https:\/\/aertecsolutions.com\/en\/wp-json\/wp\/v2\/posts\/3027","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aertecsolutions.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/aertecsolutions.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/aertecsolutions.com\/en\/wp-json\/wp\/v2\/users\/186"}],"replies":[{"embeddable":true,"href":"https:\/\/aertecsolutions.com\/en\/wp-json\/wp\/v2\/comments?post=3027"}],"version-history":[{"count":2,"href":"https:\/\/aertecsolutions.com\/en\/wp-json\/wp\/v2\/posts\/3027\/revisions"}],"predecessor-version":[{"id":14958,"href":"https:\/\/aertecsolutions.com\/en\/wp-json\/wp\/v2\/posts\/3027\/revisions\/14958"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/aertecsolutions.com\/en\/wp-json\/wp\/v2\/media\/3028"}],"wp:attachment":[{"href":"https:\/\/aertecsolutions.com\/en\/wp-json\/wp\/v2\/media?parent=3027"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/aertecsolutions.com\/en\/wp-json\/wp\/v2\/categories?post=3027"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/aertecsolutions.com\/en\/wp-json\/wp\/v2\/tags?post=3027"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}