CN235 & C295 fuel systems

Industrialization of the functional testing for the fuel systems.

¬ Checking the correct installation of the different elements of piping and pumps, as well as the sensors that provide information about

the installation behaviour.

¬ Checking maximum and partial refuelling of tanks to check the correct functioning of the refuel and defuel system and check the real capacity of the corresponding tanks as specified by the design office.

¬ Checking the cables where information is provided to other aircraft systems.